Home electrification Cranbourne VIC 3977

Taking an established Cranbourne home all-electric

Brick veneer homes with ducted gas, a gas hot water tank, a gas cooktop and often an original switchboard. We start with the board, plan every swap at the first inspection, and do them together or one at a time.

  • ★★★★★ Rated Excellent on Google
  • Every trade in-house
  • 20 min from our Somerville base
Starting pointSwitchboard and supply check
Heating swapDucted on new R1.5 ducts
Hot water swapHeat pump, normally one day
Last to goUsually the gas cooktop
Electrification in Cranbourne

Start at the switchboard, finish at the stove

Many of the established homes in Cranbourne are brick veneer with ducted gas heating in the roof, a gas hot water tank outside and a gas cooktop in the kitchen, and a good number still run the switchboard they were built with. Home electrification Cranbourne style therefore begins at the meter box, because every electric appliance that replaces a gas one adds load the old board was never designed for.

Once the board is right, the order usually follows the gas bill. The ducted heater is the largest gas user and often the oldest, and reverse cycle heats for around a third of its running cost, so heating tends to go first. The heat pump hot water swap is a one-day job. The induction cooktop comes last in most houses, and at that point there are no gas appliances left in the home.

The newer estates on the edges of Cranbourne are a different job. Some were built with gas, while the newest are all-electric already and mainly need solar, a battery and an EV charger. We work out which you have at the first inspection and write one plan that covers every step, alongside everything we do in Cranbourne.

Upgraded switchboard with every circuit labelled at a mount martha home, by powerband electrical
An upgraded switchboard with every circuit labelled, from an electrification job in Mount Martha.
Home electrification Cranbourne

Four stages for an established home

The usual sequence for a Cranbourne brick veneer. Each stage can stand alone or run together with the next.

01

1. Board and supply

We check the switchboard, main switch and supply phase. If the board is original or full, it is replaced with one that has room for heating, hot water, induction, solar and an EV charger, so the job is done once.

  • Board checked first
  • Space for every circuit
  • Certificate of Electrical Safety
02

2. Heating and cooling

The ducted gas heater is replaced with Braemar, Mitsubishi Electric or Hisense ducted reverse cycle on new R1.5 insulated ducts, typically over one to two days. Rooms the ducts do not reach can take a split system, a few hours each.

  • New R1.5 insulated ducts
  • Braemar, Mitsubishi Electric, Hisense
  • VEU discount applied
03

3. Hot water and cooking

A heat pump from Emerald, Reclaim, iStore or Haier replaces the gas tank in a day, and an induction cooktop goes in on its own circuit. After that, nothing in the house needs gas.

  • Heat pump in one day
  • Induction on its own circuit
  • No gas appliances left
04

4. Solar, battery and EV

With the electric load known, the solar and battery are sized to it, and an EV charger can share the same system. Some households do this stage first if the roof is ready, as long as it is sized for the end result.

  • Sized to the electric house
  • Battery for the evening
  • EV charger optional
Products we install in Cranbourne

The full range is on our products page.

Gas to electric CranbourneHeating and cooling

Ducted reverse cycle on new R1.5 ducts, or split systems, in place of ducted gas or a wall furnace.

  • Braemar
  • Mitsubishi Electric
  • Hisense
Get off gas CranbourneHeat pump hot water

A heat pump in place of the gas storage or instantaneous unit, usually changed over in one day.

  • Emerald
  • Reclaim
  • iStore
  • Haier
All electric home CranbourneInduction cooktops

The last gas appliance in most kitchens, replaced with induction on its own circuit.

  • Supply and install
  • Dedicated circuit
Home energy upgrades CranbourneSolar, battery and EV

Solar and storage sized for the new electric load, with an EV charger on the same system.

  • Jinko and Aiko panels
  • Sigenergy, GoodWe, Tesla
Jobs nearby

Gas-free homes from across Melbourne

No written-up whole-home job in Cranbourne yet. These three are from Berwick, Doreen and Mount Martha.

All case studies

Berwick: an all-electric family home

Five bedrooms, all electric, and a system built to carry it: 13.775kW of solar, 40.3kWh of battery and a three-phase EV charger. On a 35 degree day, one of the hottest of the year, the house drew almost nothing from the grid.

  • Five-bedroom home
  • 13.775kW, 40.3kWh
  • Three-phase EV charger
Read the case study

Doreen: ducted gas, hot water and cooktop

One team replaced all three gas appliances in one job: 23.5kW ducted reverse cycle with 12 vents and seven AirTouch 5 zones planned room by room on the floor plan, a Reclaim CO2 heat pump and an induction cooktop.

  • 23.5kW ducted reverse cycle
  • Seven AirTouch 5 zones
  • Induction cooktop
Read the case study

Mount Martha: wall furnace out, solar in

The gas wall furnace in the hallway was decommissioned and replaced with reverse cycle. An Emerald heat pump took over the hot water, 29 Jinko panels went on the tile roof, and 27.12kWh of SigenStor with a backup gateway sits behind a switchboard upgrade with every circuit labelled.

  • Reverse cycle heating
  • Emerald heat pump hot water
  • SigenStor 27.12kWh
Read the case study
How we plan it

From first visit to last gas appliance

You can do it in one run of visits or spread it over time. The plan is the same either way.

Powerband technician installing a reverse cycle heating and cooling system
  1. 01
    Inspection of the whole house

    Board, supply, roof space and ducts, the hot water tank, the kitchen and the roof faces, all in one visit.

  2. 02
    Written plan

    Every swap listed in order, with what each needs from the switchboard and where solar fits in.

  3. 03
    Fixed price for each stage

    Incentives applied stage by stage, so you can start with one and add the next when you are ready.

  4. 04
    Board work first

    If the switchboard needs replacing, we do it at the start so every later stage connects straight in.

  5. 05
    Swaps by our own trades

    Electricians, plumbers and refrigeration technicians are Powerband staff, the same people from start to finish.

Incentives

What applies to which swap

Each item has its own incentive, or none. Here is the honest list.

01
Heating, cooling and hot water

Victorian Energy Upgrades discounts apply to reverse cycle heating and cooling and to heat pump hot water, largest when replacing gas. STCs also apply to the heat pump.

02
Solar, inverter and battery

STCs and, for eligible owner-occupiers, the Solar Victoria rebate and interest-free loan on panels and inverters. Batteries get the federal Cheaper Home Batteries discount of around 30 percent, with no income test.

03
Induction and EV chargers

No rebate on either. Both are a fixed price on the quote, as is any switchboard work they need.

Why Powerband

Built for whole-house jobs

Every stage of an electrification needs a different licence. We hold them all.

01
Switchboards handled

Old boards are the most common snag in established homes, and we replace them as part of the plan.

02
Every trade in-house

Electrical REC 32300, plumbing BPC 132072 and ARC licensed refrigeration AU 065299, all on staff.

03
Heating done properly

New R1.5 ducts as standard on ducted swaps. See heating and cooling in Cranbourne for how we approach it.

04
Experience behind it

5,000+ Melbourne homes started on electrification and 10,000+ products installed.

Reviews

What home electrification customers say

Live Google reviews. Look for the whole-home and off-gas jobs.

Posted on Google Google
Brendan jopling profile picture
Brendan Jopling
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
The whole experience of working with Powerband has been fantastic. From the get go they were helpful with the design, requirements and answering all the questions we had about the install. We couldn't be happier with choosing them for the job. Special thanks to Bailey and the team for getting the entire installation done in one day it was a huge job so for it to be done and to such a high standard is much appreciated Thanks everyone at Powerband for all you've done
Posted on Google Google
Ken henderson profile picture
Ken Henderson
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
We have just had a Braemer Dominator reverse cycle ducted system installed by the Powerband Electrical team to replace our gas-fired system. We were very happy with the whole process, from the sales/design discussions with Dayle to the installation by the team led by Julian and including Logan and Darren. Using the existing ducting had its challenges but the team overcame them well. Julian set up the AirTouch5 control system & zoning with us and with a sudden cold snap arriving it has proven simple to use to create a comfortable environment. In fact we are already finding it far more effective system than the considerably larger gas unit and a more uniform heat with less draughts. Thanks to the Powerband team. Ken in Glen Waverley
Posted on Google Google
Nessrin m profile picture
Nessrin m
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Amazing service and work! Would definitely recommend Tim and his team 👍
Posted on Google Google
Carrick mclellan profile picture
Carrick McLellan
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Petris and his electrical team did 2 inverter airconditioner installs as part of our whole solar system install. Great workers, good thinkers who could sort out a couple of small issues in short order and wonderful people to have around our house. Organised and professional. Highly recommend Powerband.
Posted on Google Google
Brad adams profile picture
Brad Adams
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Work was carried out very effectively and efficiently with the guys cleaning up after themselves. Very happy with the service and end product.
Posted on Google Google
Darren morris profile picture
Darren Morris
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Very happy with our solar and battery install. Everything was well explained before, during and after and completed on time. Would definetly recommend.
Posted on Google Google
Jarrod bailey profile picture
Jarrod Bailey
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Had the Powerband team electrify out whole house. Updated the heating / cooling with split systems, replace gas cooktop & hot water and put solar on with a 30kw battery. No gas bill, solar is producing more energy than we consume. These days we barely even have the supply charge. As part of it, they put the package together of what we wanted and needed to future proof our house and showed us several options for paying for it, in the end we opted for a 5-year interest free loan. Looking at our numbers, most of the loan will be paid off from the savings from our gas and electricity savings. All the work and upgrades done and barely any out of pocket cost, nice.... The team were great - worked in with timing for the jobs when it worked for us. The boys on site were all great, friendly, polite and professional. Did the job well and packed up (and cleaned up) well. Happy to recommend Powerband to anyone wanting to electrify their house in a cost-effective way.
Posted on Google Google
Stephen wratten profile picture
Stephen Wratten
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Great local friendly Aussie company, very neat job, cleaned up after. Installed 15kw solar and 24kw Sigenergy, zero hassles.. 👍
Posted on Google Google
Liga byron profile picture
Liga Byron
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
The installation guys were really good. Polite. And cleaned up when the job was done. I would highly recommend them. The price was also very good.
Posted on Google Google
Will livesay profile picture
Will Livesay
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Powerband Electrical are always great to work with. Reliable, professional, and easy to coordinate with on jobs. Their team communicates well and turns up when they say they will. Highly recommend.
FAQ

Cranbourne electrification questions

Questions about going all-electric in Cranbourne. Call 0466 355 441.

Why does the switchboard come first?

Every swap adds electrical load. An original board often lacks space or modern protection, and replacing it at the start avoids redoing work later.

Can we keep our existing ducts?

Our default is new R1.5 insulated ducts, because gas heating ducts were not sized for cooling. A Braemar Dominator keeps the existing ducts only where they cannot be replaced, usually in a double-storey home.

Our home is a newer build with no gas. What is left to do?

Usually solar, a battery and an EV charger, and possibly a heat pump if the house has an electric element tank. The plan is shorter, but the sizing matters just as much.

How long until we are fully off gas?

That depends on the pace you choose. Done back to back, ducted heating takes one to two days, hot water one day and induction a shorter visit. Many households spread it out.

Is there one rebate for the whole thing?

No. VEU covers reverse cycle and heat pump hot water, Solar Victoria covers panels and inverters, the federal discount covers batteries, and induction and EV chargers have none.

What do we gain once the last gas appliance goes?

One energy bill instead of two, and you can stop paying for a gas connection you no longer use. Paired with solar, much of the house then runs on your own roof.

Get started

Plan an all-electric home in Cranbourne

A whole-house inspection, then a written plan with fixed prices for each stage, incentives already applied. No obligation.

Get your free quoteWe reply within one business day
Your details stay private. No spam, no obligation.